Battery Power Trailer

Fully Electric Battery Generator Trailer for Industrial Sites with Sustainability Goals or Noise Restrictions

The MTGA Generator Replacement Trailer is a fully electric battery power trailer built to replace diesel generator trailers on industrial and mining sites. Six 48V 150Ah LiFePO4 batteries deliver 43.2kWh of power through four outlets, two 5-pin three-phase 20A and two 3-pin single-phase 15A, running most equipment for up to 17 hours at 2kW draw. Recharge takes four hours.

No engine, no exhaust, no fuel logistics. Almost no noise, which makes it the right call for sites operating under noise restrictions or near sensitive areas. No moving parts means no major generator maintenance, just charge it and use it. Tow it in with any light vehicle, connect your devices and you’re running.

  • 3 X VICTRON MULTIPLUS II INVERTERS
  • SUPER FAST BATTERY RECHARGE
  • ENGINEERED RUGGEDISED FOR OFF-ROAD USE
  • A HUGE 43.2kWh BATTERY CAPACITY
  • HEAVY DUTY SUSPENSION
  • 2KW THREE PHASE POWER OUTPUT
  • 4KW SINGLE PHASE POWER OUTPUT

See It in Use

Specifications

Tow Coupling
50mm ball
Type
ADR Compliant Trailer
Axle
Single axle trailer with extendable
Inverter/Charger
Drawbar
Output Voltage
3 x Victron MultiPlus-II 48/5000
Output Power (25°C ambient)
400V 50Hz (three phase), 230V 50Hz (single phase)
Output Power (40°C ambient)
12kW (three phase), 4kW (single phase)
Outlets
2x 5-pin three-phase 20A, 2x 3-pin single-phase 15A
Inlet
1x 5-pin three-phase 20A
Charge Time
4 Hours to full charge
Batteries
43.2 kWh in total, 6 x 48V 150Ah LiFePO4 Batteries
Runtime
Approx. 17 h at 2 kW draw

Why Choose This Product

  • Zero Emissions, Zero Engine Maintenance

    Zero Emissions, Zero Engine Maintenance

    Fully electric with no moving parts, no fuel costs, no exhaust emissions and no engine servicing. For mine sites working toward scope 1 emissions reductions, replacing a diesel generator trailer is one of the most direct operational changes available.
  • Almost Silent Operation

    Almost Silent Operation

    With no combustion engine, the Generator Replacement Trailer produces almost no noise in operation. For sites with noise restrictions, residential neighbours or operations running in sensitive environments, that's a practical compliance advantage as well as a sustainability one.
  • 43.2kWh Across Four Outlets for Up to 17 Hours of Runtime

    43.2kWh Across Four Outlets for Up to 17 Hours of Runtime

    Six LiFePO4 batteries power two 5-pin three-phase 20A outlets and two 3-pin single-phase 15A outlets simultaneously. Runs most industrial equipment for up to 17 hours at 2kW draw before needing a recharge.
  • Tow In, Connect, Run

    Tow In, Connect, Run

    Attaches to any light vehicle. Move it into position, connect your devices and you're running. No setup complexity, no fuel deliveries to coordinate, no generator warming up.

Built for Sites Moving Away From Diesel

  • Mining

    Replacing diesel generator trailers at remote mine sites where emissions targets, fuel logistics and noise restrictions all create pressure to find a cleaner alternative.
  • Civil Construction

    Quiet, emissions-free power for civil projects operating near residential areas or under site noise restrictions.
  • Defence & Government

    Sustainable, low-noise power for remote installations and forward deployments where fuel supply is a logistical challenge.

Battery Power Trailer

For full specifications download the brochure

Replacing Diesel on Site, One Process at a Time

Mining operations face mounting pressure to reduce on-site emissions and hit net zero targets. The MTGA Decarbonisation Range replaces diesel-powered equipment with fully electric alternatives, same performance, none of the fuel cost or emissions.

The Generator Replacement Trailer removes diesel from your on-site power supply. If you're also looking to eliminate diesel from your wash down process, the Battery Wash Down Trailer delivers 3000psi electric pressure washing from an industrial lithium battery bank with zero emissions and a four-hour recharge.

Talk to The MTGA Team

Ready to take diesel power generation off your site? Get in touch and we’ll put together a quote.